Operational Methodology
Mission Workflow
A Mission is Finversa’s operating unit: objective, mandate, Runtime, and outcome. Not an isolated trade.
Mission = system, not a click
If you cannot narrate objective → Deployment → Telemetry → close, you are not operating Finversa. You are hoping on a Runtime.
Step-by-step guide
Objective · Deployment · Telemetry
- 1
Define the Mission objective
Write what the Deployment must achieve: Risk profile, horizon, instruments, constraints. Without an objective there is no Mission Control — only activity.
- 2
Select Engine, preset, and Trading Account
Align Product/Version, preset, assigned Capital, and account. That is the mandate. Changing it mid-Mission requires formal close and reopen.
- 3
Run the Deployment Checklist
Engine installed, valid license, Runtime ONLINE, Telemetry active, broker verified, preset loaded, AutoTrading, Deployment complete. No optional steps.
- 4
Confirm Heartbeat and Telemetry
Before opening exposure: Heartbeat within TTL, Health ok, Risk and Capital visible in Protocol. If a field is missing, you are not LIVE in the Finversa sense.
- 5
Operate from Mission Control / Command Center
During the Mission you govern Fleet states (ONLINE, IDLE, WARNING, RECOVERY) and apply Operational Rules. Do not micro-manage every fill: govern the system.
- 6
Close, archive, realign
Close Mission: flat or close-policy executed, coherent IDLE/OFFLINE state, Risk/Capital/Recovery notes. Then realign buckets for the next Mission.